bents
英
美
网络 班茨
双语例句
- Plane calculation method is usually adopted for high-piled wharf design, i. e., to calculate the interal force of structure in the transverse longitudinal plane directions, in which, transverse bents are calculated as flexible platform and longitudinal girders as elastic supporting continuous girders.
在高桩码头设计中,通常采用平面计算方法,按纵向和横向2个平面进行结构内力计算,即横向排架按柔性桩台计算,纵梁按弹性支承连续梁计算。 - In order to meet requirements of structural design specification, foundation treatment was conducted by means of replacement of the filling materials in the foundation, rigid connection of the transversal beams with columes was adopted to make transversal bents become rigid frames.
通过采用地基换填处理,以及楼体横梁与立柱采用刚性连接,使横向排架形成刚架结构等方法,使结构设计满足规范要求。 - If the floor is not sufficiently rigid to transform the loads, a horizontal bracing system must be provided between bents.
如果楼面没有足够的刚度去传递这些荷载。那么还必须在排架之间增加水平支撑系统。 - The distribution of the collusion force on the bents is discussed.
对船舶碰撞力在排架上的分配进行了讨论。 - Analysis of symmetrical multi-storey and single-bay bents under wind loads and Vierendeel trusses with symmetrical parallel chords by lin's method of one-cycle moment distribution
用林氏力矩一次分配法分析对称式多层单间排架的风应力及对称式平行弦连框桁架 - Construction Techniques for Erecting Arch Bridges with Large Lifting Capacity Cable Crane Mounted on Movable Bents
大吨位移动塔架缆索吊机架设拱桥施工技术 - The Method for Calculating the Temperature Effect on Longitudinal Bents Considering the Elastic Resistance of Transverse Beams
考虑横梁弹性抵抗的纵向排架温度内力分析法 - The performance of hysteresis type damper and the bents of elevated pile wharf with and without absorbing adaptor are tested.
本文对滞回式阻尼减震元件的性能、设与不设减震接头的高桩码头排架进行了试验。 - Resting on H shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth.
枕在H型的铁架上,管道长长的一部分在冰冻地面的上空走着“之”字形。 - Since shafting bearing faults occurred to a generating unit after running for 20, 000 hours, the lower bents of the quaternary superheater burst in succession after start and stop for several times.
某机组运行2×104h时因汽轮机轴承出现故障,多次启停后导致锅炉四级过热器下弯头处相继发生爆管。